PressReader Website and App Currently Unavailable

PressReader is not working. We aim to restore the service soon. Thank you for your patience.

Published:
Tuesday, March 24, 2026 - 7:00pm
Central Library: SAD Therapy Lamp Out of Order

The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.

Published:
Monday, March 23, 2026 - 10:00am
Central Library: Children's Area Renovation on 2nd Floor, March 30-April 27

Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.

Published:
Monday, March 23, 2026 - 9:00am
Bookmobile Service Modifications

Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.

Tuesday, March 24
McMaster 3:30-4:30pm - Cancelled
Greencedar 4:30-5pm (instead of 4-5pm)

Wednesday, March 26
Rockton 10:30-11:30am - Cancelled
Meadowlands 3:30-4pm - Cancelled
Bennetto 5-5:30pm (instead of 4-5:30pm)

Published:
Monday, March 16, 2026 - 10:15am
Central Library - New Library Card Check-in Process

Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.

Published:
Friday, March 13, 2026 - 5:45pm
Concession Branch Children's Area Reduced Service

A Children's area activity table, including the children's computers at Concession Branch are unavailable due to a facility issue. We aim to fix them as soon as possible.

Published:
Monday, March 9, 2026 - 11:30am
HPL Telephone Main Line Roll Back

HPL's original phone number is back in service. Please call 905-546-3200. The 289-779-7588 number, created due to the 2024 cybersecurity incident, is also working.

Published:
Friday, March 6, 2026 - 9:15am
Valley Park Community Centre Closure

From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026. 

Valley Park Branch will remain open during the renovations for your library needs.

www.hpl.ca/valley-park

Published:
Friday, February 27, 2026 - 11:00am
Concession Branch: Renovations

As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.

Published:
Tuesday, February 10, 2026 - 1:00pm
Sherwood Branch: Renovations

As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.

Published:
Tuesday, February 10, 2026 - 1:00pm
Carlisle Branch Accessible Washroom Out of Order

The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.

Published:
Tuesday, January 27, 2026 - 12:30pm

History of Gore Park

Concrete bunker buildings demolished
Concrete bunker buildings demolished

Council voted to tear down the buildings and start over, hiring a registered landscape architect to oversee the job. The Chief Administrative Officer defended his as “a money-saving thing". Council started from scratch and hired the Toronto firm of Moorhead, Fleming, Corban and McCarthy in January 1984 for $54,000 to redesign the park. Their plan called for lots of grass, flowers and trees with a small fountain. On February 29, 1984 council unanimously endorsed the plan with a proviso that the location of the fountain be reviewed (55). The Victorian fountain proposed was re-designed as a polished granite block one-metre square with water bubbling up through the middle. One alderman said that it would "turn into a urinal for the winos who hang around the park" and another said, "(t)his isn't a fountain, it's a big hunk of stone". Nevertheless, the fountain was approved the same day that the estimated losses incurred in the Gore Park fiasco were announced - $715,000 (56).

Gore Park renovations begin again
Gore Park renovations begin again

In November of 1984 the renovations to the park and adjoining roadway were completed at a cost of $2.5 million. Three months later a whole section of the interlocking bricks had heaved up and was, in the words of one alderman, "a hell of a mess" (57) Consultants were hired at a cost of $5,000 to determine what went wrong with the bricks. Their report concluded the "undersized interlocking bricks were used, sub-drains were never installed, contract drawings failed to show needed work, road design was inadequate, road slope was inadequate, inferior materials were used for a road base and the road was opened before it was ready to bear traffic” (58). The cost for re-doing it correctly so that the problem would not reoccur was $87,500 (59), Instead of following the advice of the consultants, council voted to take on a cheaper half-price plan to fix the damage. Their share would be $7,000, which had escalated in one week to $15,000.

Gore Park renovated
Gore Park renovated

The arrival of the 21st century has led to more changes for the Gore. The Gore is no longer a transit hub for the city with the arrival of the Macnab Transit Terminal in 2011. Recent renovations to the Gore have led to a more pedestrian-friendly look for Hamilton's first park.