The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.
Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.
Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.
Wednesday, March 26
Rockton 10:30-11:30am - Cancelled
Meadowlands 3:30-4pm - Cancelled
Bennetto 5-5:30pm (instead of 4-5:30pm)
Tuesday, March 31
Court at Rushdale - Reminder bi-weekly stop changed to 10:30-11am
Wednesday, April 1
Swansea 10:00-10:30am - CANCELLED
Helen Detwiler 11:00am-12:00pm - CANCELLED
Warplane Museum 3:00-4:00pm - CANCELLED
Friday, April 3 - Library Closed
All stops CANCELLED
Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.
A Children's area activity table, including the children's computers at Concession Branch are unavailable due to a facility issue. We aim to fix them as soon as possible.
HPL's original phone number is back in service. Please call 905-546-3200. The 289-779-7588 number, created due to the 2024 cybersecurity incident, is also working.
From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026.
Valley Park Branch will remain open during the renovations for your library needs.
As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Red Hill Creek Expressway Books: 1976-1979
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH







