Parkdale Branch Network Unavailable

There is an ongoing Wifi disruption due to Wi-Fi Upgrades at Parkdale Branch on Nov 5th. We aim to resolve this issue as quickly as possible.

Published:
Wednesday, November 5, 2025 - 9:15am
Red Hill Branch Network Unavailable

There is an ongoing Wifi disruption due to Wi-Fi Upgrades at Red Hill Branch on Nov 5th. We aim to resolve this issue as quickly as possible.

Published:
Wednesday, November 5, 2025 - 9:15am
Red Book Will Be Unavailable Tonight

The Red Book will be unavailable tonight from 10PM until approximately 4AM as we are upgrading the service. Thank you for your patience.

All Branches and Bookmobile Stops
Published:
Wednesday, November 5, 2025 - 9:15am
Concession Branch and Sherwood Branch Network Unavailable

Wi-Fi disruption due to Wi-Fi Upgrades at Concession Branch and Sherwood Branch on Nov 6th. We aim to resolve this issue as quickly as possible.

Published:
Monday, November 3, 2025 - 12:15pm
Waterdown Branch Network Unavailable

Wifi disruption due to Wi-Fi Upgrades at Waterdown Branch on Nov 4th. We aim to resolve this issue as quickly as possible.

1
Published:
Monday, November 3, 2025 - 9:45am
Kenilworth Branch Reopening

The Kenilworth Branch has reopened today, Monday, October 27. Please note that there is limited parking, and noise disruptions may occur this week as the final touches are made to the renovations. Thank you for your understanding.

1
Published:
Monday, October 27, 2025 - 3:00pm
Delayed Branch Openings 

The following locations have upcoming delayed openings due to Staff training drills. 

Friday, November 7
Terryberry Branch, 10am

Monday, November 10 
Concession Branch, 10am

Thursday, November 13
Binbrook Branch, 10am

Friday, November 14
Valley Park Branch, 10am

Monday, November 24
Mount Hope, 2pm

Thursday, November 27
Stoney Creek, 10am

You may visit nearby Branches for your library needs. www.hpl.ca/hours

All Branches and Bookmobile Stops
Published:
Tuesday, October 7, 2025 - 2:00pm
Replacement and Damage Fees

Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items. 

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm

Red Hill Creek Expressway Books: 1976-1979

Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study

Deleus Cather, Canada Ltd.

February 1978

R388.40971352 STU CESH

 

Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection

The Regional Municipality of Hamilton-Wentworth

July 1978

R388.40971352 HAM CESH Vol. 1

 

Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise

S.M. Taylor, S. Birnie, and F.L. Hall

Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada

Environment and Planning A, volume 10, pages 1377-1386

1978

CA3ONHWAO5 84 B1637

 

The effects of the Upper Ottawa street landfill on Redhill Creek

Ontario. Water Resources Assessment. Technical Support

Ministry of the Environment

1978

R628.1686713 On8 CESH

 

Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4

The Regional Municipality of Hamilton-Wentworth

January 1979

R388.40971352 HAM Vol. 2 CESH

 

Floodplain Analysis Red Hill Creek Valley

March 1979

R627.40971352 FLO CESH

 

Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation

May 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission

Regional Engineering Dept.

1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility

July 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council

July 18, 1979

R388.40971352 MOU CESH

 

Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4

The Regional Municipality of Hamilton-Wentworth

August 1979

R388.40971352 HAM Vol. 3 CESH

 

Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives

Hamilton-Wentworth Regional Municipal Council

1979

CA3ONHWAO5 79 M52

 

Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee

Ministry of Transportation and Communications

1979

R388.40971352 RED CESH